Forest Row School

Case study challenge icon for heating projects

Challenge

The school had experienced a total heating and hot water failure due to heavy corrosion within the main heating pipes and external ductwork. This had caused a major leak with no possibility of a temporary repair.

SOLUTION

Roselands Heating carried out a site survey to assess the extent of the corrosion and then, working closely with the school and East Sussex County Council, provided a competitive quotation for the repairs.

The works were started almost immediately and were completed on time and within budget. A new sump pump system and flood warning alarm were fitted to ensure the new installation had the maximum possible lifespan.

Case study solution icon for heating installations
Reliable heating engineers service icon

Benefits

  • Minimal downtime for the school
  • Increased thermal efficiency due to the new waterproof insulation and coated pipework
  • Reduced fuel bills
  • Complete reinstatement of pathways
  • Installation of a monitoring system to prevent further flooding or damage